OMNI HOTEL
ATLANTA, GA
CHALLENGE
A high end hotel was being constructed at the Battery Atlanta, located adjacent to the new Atlanta Braves Stadium, and required retaining wall at the entrance of the hotel to provide support of a landscape area.
SOLUTION
Pinnacle Design/Build was selected by the project’s general contractor to design and construct a wire faced MSE retaining wall with rock veneer. The retaining wall utilized local quarried granite for the natural veneer and was constructed in three weeks.
VALUE
Pinnacle Design/Build provided the necessary expertise to install the retaining wall.
PROJECT FACTS
Wall Area: 911 SF
Max Height: 9 FT
Completed 2016