NATURAL GAS PROCESSING FACILITY
NEW MILTON, WV

CHALLENGE
A new gas processing facility needed a solution to provide slope stability and stormwater control to protect facility equipment and personnel from potential landslides.

SOLUTION
Pinnacle Design/Build constructed three 2:1 reinforced soil slopes as part of the initial site development. A soil nail retaining wall system was installed on another side of the processing facility. A TECCO Mesh system was installed over the soil nail retaining walls to provide reliable stability and minimize any potential slope deformations.

VALUE
Pinnacle Design/Build provided value engineering to supply this client a cost-effective design solution for the unique design constraints provided by the project. This project was completed in 2019.

PROJECT FACTS

Tecco Wire Mesh Area: 8,820 SF Soil Nails: 399 Nails
RSS Max Height: 83 FT
RSS Face Area: 135,466 SF
Completed 2019

REINFORCED SOIL SLOPE AND SOIL NAIL
WITH TECCO SLOPE STABILIZATION