FLINT RUN SUBSTATION
NEW MILTON, WV
CHALLENGE
The owner of this electric transmission substation required a retention system for hill side stability of active infrastructure, the facilitation of grading, and access road activities.
SOLUTION
Pinnacle Design/Build installed a Soldier Pile retaining wall system using 40 wide flange steel piles painted with a corrosion inhibitor paint to protect against environmental degradation. Precast concrete panels were used for the permanent fascia and earth retention.
VALUE
Soldier Pile retaining walls provide effective solutions for project sites that require retaining walls for grade separations in cut conditions, and Pinnacle Design/Build provided the necessary knowledge and expertise to install the retaining wall system.
PROJECT FACTS
Wall Area: 14,396 SF
Max Height: 47 FT
Completed 2020